Zhongshan, Guangdong, China · GT 8 (GMT+8) evelyn_lin@machiningservice.cn  |  Request a quotation

Small Batch CNC Machining in China — No Minimum Order, From a Few Dozen Pieces

Boyang Hardware · Zhongshan, Guangdong · Prototype to repeat production in one facility

Direct answer Boyang Hardware has no fixed minimum order quantity. Prototypes and small batches are accepted, from a few dozen pieces upward, and repeat production runs are quoted at the same time so the price curve is visible from the start. Samples ship in 3–7 working days; mass production takes 8–30 working days. Small batches and full production runs are produced in the same Zhongshan facility with the same standard: 100% inspection before shipment on every run.

On this page

Who orders small batches, and why

Three buyer situations make "no MOQ" the deciding factor, not the price per piece:

The economics of a small batch from China — the honest version

Table 1 — What changes and what does not, between a 30-piece and a 3,000-piece order at one facility.
Cost element Small batch (tens) Production (thousands)
Tooling None (CNC) None for CNC; casting/moulding tools only if volume justifies — see break-even analysis
Set-up and programming Spread over few parts — visible in unit price Spread over many parts — small in unit price
Unit machining cost Higher Lower, with a quoted price curve
Freight Express; per-part freight small for compact metal parts Sea freight; per-part freight lowest
Inspection 100% before shipment, unchanged 100% before shipment, unchanged

The practical rule: for compact machined metal parts, express freight on a small batch is a modest fraction of part cost, so a Chinese small batch typically beats local low-volume machining on price while matching it on lead time. For heavy or bulky parts the arithmetic changes — send the drawing and destination so the landed cost is quoted, not just the part price.

Prototype and production in one facility, one standard

Because prototypes and production share the same machines and the same inspection process, the approved prototype is a real reference, not a promise. A first article inspection record from the prototype run becomes the benchmark for repeat batches; drawings are versioned so a production order never drifts from the approved sample; and the repeat-run price curve is quoted at the start, so scaling up needs no re-negotiation.

When a small batch stops making sense

Above roughly 2,000 pieces of a die-castable geometry, a casting tool usually starts to pay for itself; above roughly 5,000 thermoplastic pieces, an injection mould does. The crossover depends on geometry, material and tool cost — see the worked die casting vs CNC break-even calculation rather than a single asserted threshold.

Honest limits: "no minimum" does not mean "free set-up". A 5-piece order carries real programming and set-up cost per part, and we will say so in the quote rather than hide it in the unit price. And small batch does not mean small standards: inspection is 100% on every run, whatever the size.

FAQs

What is the smallest order you accept?

From a few dozen pieces upward is the stated norm; there is no fixed minimum order quantity. Very small quantities are quoted honestly, with set-up cost shown per part.

Will my repeat batches match my first batch?

Yes — same facility, same machines, same inspection standard. The first article inspection record from the prototype run is the reference document for repeat batches.

How do you ship a small batch?

By express or air for urgent or small orders, by sea for production volumes. Shipping terms include EXW, FOB, CIF, CNF, DDP and DDU; payment by T/T, PayPal or Western Union.