Zhongshan, Guangdong, China · GT 8 (GMT+8) evelyn_lin@machiningservice.cn  |  Request a quotation

Contact Boyang Hardware

Direct answer

Send quotation requests and drawings to evelyn_lin@machiningservice.cn, addressed to Ms. Evelyn Lin, Business Department. The manufacturing address is No. 12, Minying West Road, Shiqi District, Zhongshan City, Guangdong, China 528400. Quotations are returned within 1–2 working days, and a design-for-manufacturing review is included at no cost. English and Chinese are both spoken.

Contact channels

Table 1 — How to reach the company
PurposeContactTypical response
Quotations and drawingsevelyn_lin@machiningservice.cn1–2 working days
Technical questionsevelyn_lin@machiningservice.cn — mark for the engineering team1–2 working days
Existing orders and production statusQuote the purchase order or part number in the subject line1 working day
Quality documentationState the requirement at quotation; documents are issued with the shipmentWith the order
Supplier verification and complianceRequest the business licence or a certificate scope in writing1–2 working days
Factory visits and inspectionsArrange in advance so access and scheduling can be plannedConfirm dates on request

What to include in a quotation request

The faster a request is complete, the faster the quotation is usable. Items 1 to 5 are required; 6 to 10 change the price or the schedule and are worth stating if they are known.

Table 2 — Request checklist
#ItemWhy it matters
1Drawing or 3D model2D as PDF or DWG, 3D as STEP, IGES or X_T. The 2D drawing carries the tolerances and datums
2MaterialGrade, not just family, so the correct stock and cutting data are used
3QuantityPrototype, first batch and expected annual volume, quoted together
4Critical tolerancesMark the dimensions the assembly depends on rather than tightening the title block
5Surface finishFinish type, colour, and any Ra value
6Target dateAllows the schedule to be built around the real constraint, usually the finishing process
7Inspection requirementWhich dimensions need reporting, and whether third-party inspection is required
8DocumentationMaterial certificate, dimensional report, certificate of conformity, or a specific standard
9Packing and labellingCustom packing, kitting or barcode labels affect cost and lead time
10Shipping termsEXW, FOB, CIF, CNF, DDP or DDU, and the destination
If the drawing is not finished Send it anyway. A rough model plus the function of the part is often enough to give a DFM opinion and an indicative price, and the tolerance question is usually easier to settle before the drawing is frozen than after.

Response times

Table 3 — Standard response and delivery times
StageTime
Acknowledgement of an enquirySame or next working day
Quotation, complete drawings1–2 working days
DFM reviewIncluded with the quotation
Sample production3–7 working days
Mass production8–30 working days, depending on quantity, material and finish

Manufacturing address

Boyang Hardware Zhongshan Boyang Hardware and Plastic Products Co., Ltd.
No. 12, Minying West Road
Shiqi District, Zhongshan City
Guangdong, China 528400

Contact Ms. Evelyn Lin, Business Department
evelyn_lin@machiningservice.cn

Zhongshan sits in the Pearl River Delta, between Guangzhou to the north and Zhuhai to the south, with road access to the ports and airports of the Greater Bay Area.

Questions about contacting us

Is there a contact form?

Email is used instead, because drawings and 3D models attach directly to it and the whole thread stays in one place. Send to evelyn_lin@machiningservice.cn. Putting the part name and quantity in the subject line speeds up routing.

What languages are spoken?

English and Chinese. Drawings and specifications are read in English, and metric and imperial dimensions are both accepted.

Can I send drawings before agreeing an NDA?

Ask for an NDA first if the design is sensitive. It is put in place before drawings are shared, and drawings are not passed to third parties.

Can I visit the factory?

Yes. Arrange the date in advance so the production schedule and access can be planned, and state whether a buyer-nominated inspection agency will attend.

What if I need a part quickly?

State the required date in the request. Machining has no tooling lead time, so the constraint on a rush part is usually material availability or the finishing process, and saying which matters lets the schedule be built around it.

Send the drawing

Quotation in 1–2 working days, with a design-for-manufacturing review included.