CNC Machining With 100% Inspection Report Before Shipment
Boyang Hardware · Zhongshan, Guangdong · Every part measured, every shipment documented
- 100%parts inspected, not sampled
- CMM3D coordinate measuring
- 4documents per shipment
- 100%visual inspection too
- ISO 9001recorded, cert on request
- 2016operating since
On this page
- The inspection workflow
- Equipment and what each is for
- Documents supplied with a shipment
- If something is wrong
- Honest limits
- FAQs
The inspection workflow, step by step
| Stage | What is checked | With what |
|---|---|---|
| 1. Incoming material | Material grade matches the drawing specification; heat/lot recorded | Material certificate from the mill or distributor |
| 2. First article (new parts) | Every dimension on the drawing measured on the first off part | CMM, calipers, height gauges; FAI record issued |
| 3. In-process | Critical features checked during machining so errors are caught at the machine, not at the end | Calipers, micrometers at the machine |
| 4. Pre-shipment, 100% | All dimensions on every part, plus 100% visual inspection for burrs, finish and cosmetic defects | CMM, optical projector, calipers, height gauges |
| 5. Documentation | Reports compiled per shipment and packed with the parts | Dimensional report, material cert, FAI, finish certs |
Inspection equipment — and what each one actually measures
| Equipment | What it is for | Typical role |
|---|---|---|
| 3D CMM (coordinate measuring machine) | Full 3D dimensional measurement of prismatic and curved features | Critical dimensions, bearing bores, datums, FAI |
| Optical projector (profile projector) | 2D profile magnified against an overlay or scale | Small features, radii, angles, thin sections |
| Height gauges | Precise height and step measurement from a datum face | Flatness-critical faces, hole positions |
| Vernier calipers | Fast general measurement of outside, inside and depth dimensions | Non-critical dimensions, 100% coverage |
How tight these measurements can go: typical process tolerances run from ±0.02 mm (3-axis milling) to ±0.005 mm (grinding, wire EDM), with 0.001 mm on critical features — see tolerance capability.
The four documents that ship with your parts
- Dimensional inspection report — actual measured values against the drawing, for the parts in that shipment.
- Material certificate — identifies the heat or lot of material used, so traceability from part back to material is intact.
- First article inspection record — issued for new parts; becomes the reference for all repeat batches.
- Outsourced finish certificates — for plating, anodising and other surface treatments performed by specialist partners.
For buyers assembling these documents into their own PPAP-style package: state the format you need at enquiry, and the report is prepared to match.
If something is wrong: how non-conformance is handled
Because inspection is 100% and documented, a non-conformance is caught before it ships — the report identifies the affected part and dimension before packing. If a customer-reported issue does occur, the material certificate and dimensional report allow the specific lot and machine route to be identified, and replacement parts are produced and inspected the same way. Claim status for our quality management system: ISO 9001 and RoHS are recorded on our Made-in-China storefront; certificate number and scope are supplied on request — see the verification record.
FAQs
Can I see a sample inspection report before ordering?
Yes — a sample dimensional inspection report is available on request, so you can see the format and level of detail before your first order.
Does 100% inspection apply to small batches too?
Yes — the standard is the same for a 30-piece prototype batch and a production run. There is no minimum order and no reduced inspection for small orders; see small batch machining.
Can you inspect to my gauge or my datums?
Datums and critical dimensions on your drawing define the measurement plan. If your company uses specific gauges or a specific report format, state this at quotation so the plan is set before production starts.